Real life lessons of implementing Activity Based Working

In this post we explore some use cases of activity based working implementations and share learnings from their experiences.

Thinking back to the many end user projects we have worked on as consultant workplace scientists, it is an interesting reflection that many organisations decide to step back from implementing a full Activity Based Working (ABW) solution.

The perceived difficulty of convincing people to give up their own allocated desks together with the dearth of convincing evidence for a tangible benefit, is enough for the faint-hearted to go no further. But for the bold, ABW is the brave new world.

So what can we learn from the experience of those that try?

Cost savings and efficient space utilisation

Most often, cost saving from space reduction is the most easily estimated with obvious financial advantageous outcomes. Space savings come about by a desk reduction from a ratio of 1:1 to say 0.7:1 to be replaced by more space efficient alternatives.

In practice our evidence of working patterns shows that of the total headcount in an organisation, no more than 70% of staff are likely to be in the office at the same time and the allocated average desk occupancy is clearly below 50%, irrespective of the business sector.

A 0.7:1 desk ratio is therefore fairly conservative but even the bold don’t always want to over do it, at least not at first.

Activity Based Working can create opportunities to improve workspace utilisation

ABW is the ideal opportunity to create a much more flexible workspace that can accommodate the inevitable organisational fluctuations and changes without the need to ever move a piece of furniture again. The detailed block plans can be thrown away and there should no longer be any need to spend time debating with senior staff who wants a change of desk location or more space.

What ABW can provide is a means to create a fluid working environment that can be routinely tweaked to improve its efficiency in terms of utilisation or perhaps to enhance the potential for inter team collaboration.

So how do the brave overcome the vociferous resistance to change that implementing ABW will create?

Case study: Activity based working for a public sector organisation

One public sector organisation wanted to provide a new attractive and well lit communal space to bring people together that were previously distributed across different buildings. Their existing working environment was defined by wood panelled offices and hushed corridors, so a lot of change was on the horizon.

The approach

The project team launched a war of attrition, which lasted many months. This involved a series of head of department workshops to thrash out why ABW was the optimal workplace solution. Various options were hypothetically tested with this group, change champions were identified below management level in the affected teams, the project team showed genuine willingness to accommodate team and role differences wherever possible and most of all did a lot of listening to understand why and where the resistance was coming from.

The outcome

The organisation got there in the end, though at times the attacks on the project team seemed very personal. One very high profile director took early retirement because their perception of the loss of status, which came with losing their own office, was too hard to bear. Others eventually found ways to exploit the new workplace for their own and their team’s advantage – the final workspace did turn out to be an inviting and engaging place for the organisation to congregate. At the same time the project team managed to retain a high degree of uniformity and therefore flexibility with the new design – the degree of tailoring required for different teams was not as great as people originally thought.

Case study: Activity based working for an engineering manufacturer

In another organisation, an engineering manufacturer, it was decided to run a pilot project setting up an ABW for 10% of the total organisation over a period of 4-5 months. This proved invaluable in so many ways.

Resistance was high at the outset. Again the legacy workplace was characterised by high numbers of single cellular offices and departments were highly segregated across different buildings on the same site. One of the key drivers of the project was not cost reduction, but to improve cross-functional collaboration. The pilot was an opportunity to push the boundaries of ABW under the less threatening guise of it simply being an experiment with genuinely no agreed intention to necessarily implement ABW for the rest of the organisation afterwards.

The approach

Despite a carefully planned and long kick-off meeting with the pilot participants, resistance remained high. Two months in this was still true, even though many breakfast listening and information sharing meetings had taken place and all participants had been invited to take part in an online feedback survey. In fact several people undermined the survey results by the way they deliberately circumvented the main survey question such was their dissatisfaction at that point. So maybe ABW was just not right for them?

Towards the end of the pilot period, attitudes began to noticeably change. This was partly helped by some small design changes requested by the participants themselves, which showed they had been listened to.

The outcome

People began to acknowledge how personally hard it had been for them to adapt, but that now they were genuinely seeing real benefits from the new way of working. We could also show that the key measure of success, which was about increased horizontal interaction across teams, had gone up by 23%. The gentle and continuous nudging from the project team and the realisation by more senior managers involved that they had to lead by example played a significant part.

As one of those pilot participants said themselves:

“I had an unfavourable view [of ABW] at the beginning. Now I am willing to look into it further and I see how it can be a lot better than before. Sorry to say, many people are missing out, where are they?”

Maybe the fainthearted will take comfort from these words.

Key takeaways

  • Goal setting – Be clear why you are doing it, find ways you can quantifiably measure success.
  • Listen to feedback – Stick to your guns but be prepared to genuinely listen and respond to feedback.
  • Wait for people to come with you – don’t force it and give it at least three times as much time as you thought for it to bed in.

Need more advice? 

{{cta(‘2ec57535-684a-46e7-a25b-42ccdfa850df’)}}

Subscribe

Get practical workspace insights and tips on how to optimise workplaces and meet net zero goals.

Dr Kerstin Sailer & Ros Pomeroy

Dr Kerstin Sailer is a German architect by training, but has never built a single house. Early on her interest has been in the social side of architecture and how space affects what people do. A sociologist at heart and a lover of all things data, her research focuses on understanding human behaviours in buildings. Workplaces in particular were the focus of her PhD from the Technical University of Dresden, which investigated the ‘Space-Organisation-Relationship’. She first came to London as a visiting PhD student and soon after joined an architectural practice, Spacelab, where she built up their workplace consultancy process, based on a rigorous research methodology. London has never let her leave again. For more than 10 years, she has been consulting organisations while at the same time developing an academic career at UCL, where she is Reader in Social and Spatial Networks. She teaches on the MSc programme Spatial Design: Architecture and Cities, where she first met brainybirdz Co-Founder Ros Pomeroy. Ros Pomeroy has always been a scientist at heart and fascinated with how things work. She must have been one of the few girls growing up in the UK in the 1970s with her own Chemistry and Meccano sets. Studying for a degree in Mechanical Engineering at Imperial College was a natural step. But finding herself dissatisfied with the prospect of sitting in a male dominated design drawing office for the rest of her career, which ignored the commercial realities of how organisations and businesses work, she took 2 years out to do an MBA at London Business School and then embarked on a period of more than twenty years working in both the Media and Telecoms sectors in business strategy, organisation development, change management and executive coaching. That quest for finding out ‘how things work’ never went away though, which is why in 2010 she went ‘back to school’ at UCL to study for an MSc in Spatial Design: Architecture and Cities, expressly to learn about the evolving field of human behaviour in buildings. With her years of end user business experience very much to the fore, this has lead to a fruitful collaboration with Kerstin Sailer. Firstly at Spacelab architects, where Ros took over Kerstin’s role to further develop the workplace consultancy practice, working with a string of high profile clients to analyse and recommend new design strategies to support the clients’ business agendas. And since 2016 in the creation of brainybirdz.